The company was founded in 2005. In 2008, a 155-meter tunnel kiln was built. In 2009, a comprehensive building was built. In 2011, the company completed the “coal to gas” project in the tunnel kiln, and dismantled the gas generator, the downdraft kiln and other equipment to build a fully automatic high-temperature shuttle kiln, and established a production and research base in cooperation with Henan University of Science and Technology to establish chemical analysis and physical testing. Laboratory. In 2012, a fully automatic high-temperature shuttle kiln was built and equipped with related equipment. In 2013, the office building of the sales department was completed. In 2014, a micro-compound building was built and equipped with a docking automatic batching system. In 2015, a special high-temperature material workshop was built, equipped with 1250T press, 630T press, 500T hydraulic press and other equipment. In 2016, a high temperature tunnel kiln was under construction.

"/>

国产极品美女高潮抽搐免费网站丨好屌草这里只有精品丨久久丁香五月天综合网丨色综合天天综合高清网国产在线丨亚洲国产一区二区精品无码

ABOUT US

aboutus

發(fā)展歷程-english.jpg